|
Site
Remediation Projects
|
| |
|
|
|
|
| |
|
|
Fairchild
Controls Site - Manhattan Beach, California
Responsibilities: Designed and implemented Remedial
Action Plan for a former aerospace manufacturing site. Evaluated
the most effective technology for remediation of high levels of
chromium, PCE and TCE in the groundwater, and designed and operated of a
full-scale vapor extraction and treatment system. |
|
|
|
|
|
|
|

|
|
Norwalk
Tank Farm - Norwalk, California
Responsibilities: Prepared and implemented Remedial Action Plan
for a former crude oil storage and refining facility. Project
involved excavation and disposal of contaminated soils, design of a soil
vapor extraction system, preparation of plans and specifications,
construction management; and treatment system operation and maintenance.
|
|
|
|
|
|
|
|

|
|
Valle
Vista Site - Hemet, California
Responsibilities: Provided site investigation, remediation
design, and construction oversight during clean-up of former burn dump
site where a major Southern California home builder was constructing a
residential development.
|
|
| |
|
|
|
|
| |
|
|
EPC
Eastside Disposal Site - Kern County, California
Responsibilities: Performed geologic/hydrogeologic
characterization and prepared engineering feasibility study for the
remediation and closure of this site used formerly for the disposal of
oil drilling wastes.
|
|
| |
Back
to Hazardous Waste Projects
|
|
|
|