Tajiguas
Landfill - Santa Barbara County, California
Responsibilities: BAS has been providing construction management
services for the development of lined cells at this municipal solid
waste landfill since 1992. Elements of construction included mass
excavation and grading; installation of geosynthetic clay liner, HDPE
geomembrane, geotextiles, geocomposite drainage fabric, geosynthetic
groundwater and leachate collection system, as well as drainage
improvements. |
|
| |
|
|
|
|
| |

|
|
Prima
Deshecha Landfill - Orange County, California
Responsibilities: BAS has been providing construction management
services in support of development projects at Prima Deshecha Landfill
since 1997. Projects have included the Phases A, A1, B, B1/A2, C1,
and C2 liner systems.
|
|
| |
|
|
|
|
| |
 |
|
Olinda Alpha
Landfill - Brea, California
Responsibilities: BAS
recently provided construction management during construction of a 3,000
linear foot storm drain channel. This included project
documentation, including meeting minutes, daily reports, schedules,
payment applications, preparation and tracking of change-orders and
submittals, photo logs and contract time accounting. |
|
| |
|
|
|
|
| |
 |
|
Ballard
Canyon Landfill - Santa Barbara County, California
Responsibilities: Provided construction management and
construction quality assurance during closure of a 30-year-old inactive
landfill. Maintained project documentation and budget, provided
technical and design assistance, and performed construction quality
control.
|
|
| |
|
|
|
|
| |
 |
|
Santa Maria
Landfill - Santa Maria, California
Responsibilities: BAS has
performed construction management during the phased closure of this City
of Santa Maria landfill. This included contract time accounting,
change order tracking, and verification of progress payments. Additional
services included review of shop drawings, responding to Requests for
Information, and preparation of a project close-out report. |
|
| |
|
|
|
|
| |
 |
|
Frank R.
Bowerman Landfill - Orange County, California
Responsibilities: BAS
provided design and construction management services during the
construction of an alternative final cover system on the landfill front
face. This included CM during the installation of a monolithic
final cover system, plus engineering support during the installation,
abandonment, replacement, and modification of the front face landfill
gas extraction system components. |
|
| |
|
|
|
|
| |
|
|
Mid-Valley
Sanitary Landfill - San Bernardino County, California
Responsibilities: BAS has provided construction management
services for the development of four phases of Double-Composite Liner
System at the site (Unit 5 Phases 2A, 3, 4, and 5B). Responsible for project
documentation and budget control, engineering support, and
construction quality control.
|
|
| |