|
Landfill
Gas Projects
|
| |
|
|
|
|
| |
 |
|
Forward Landfill
- Manteca, California
Responsibilities: BAS provided design and construction support
for the development of improvements to the landfill gas extraction and
treatment system at this operating landfill. This has included
landfill gas generation modeling, and design of a flare station,
condensate management system, and an above-grade landfill gas extraction
system |
|
| |
|
|
|
|
| |
 |
|
Hesperia
Landfill - San Bernardino County, California
Responsibilities: BAS performed a
feasibility study and designed, permitted, and constructed improvements
to a landfill gas control system that was not meeting regulatory
requirements for control of offsite landfill gas migration. |
| |
|
|
|
|
| |
 |
|
Victorville Sanitary
Landfill - Victorville, California
Responsibilities: BAS provided
design and construction management services for the installation of a
landfill gas extraction and treatment system. This included preparation
of mechanical, process, structural designs; design of a condensate
management system; permitting; equipment procurement; and construction
management and start-up support. |
|
| |
|
|
|
|
| |
 |
|
Central
Sports Park - Huntington Beach, California
Responsibilities: Investigated methane migration at a
property adjacent to the Huntington Beach Library that the City intends
to develop as a public recreational facility. Designed a LFG
migration control system and surface emissions control system.
|
|
| |
|
|
|
|
| |
 |
|
SR 85 Landfill -
Phoenix, Arizona
Responsibilities: The SR85 Landfill is a new solid waste disposal
facility being developed by the City of Phoenix. BAS was selected
in 2006 to provide on-call landfill gas design services during the
phased development of the site.
|
|
| |
|
|
|
|
| |

|
|
Skunk
Creek Landfill - Phoenix, Arizona
Responsibilities: Designed a LFG extraction and treatment system
to limit total Non-Methane Organic Compound emissions, as mandated by
NSPS standards.
The project won the Solid Waste Association of North America's
2000 Landfill Gas Control Excellence Silver Award.
|
|
| |
|
|
|
|
| |

|
|
Glendale
Landfill - Glendale, Arizona
Responsibilities: Designed expansion of LFG extraction
system to bring the site into compliance with NSPS regulations.
One objective was to accommodate high BTU landfill gas, which will be
extracted by a dedicated interior system, so it can be conveyed to a gas
utilization plant to be located nearby.
|
|
| |
|
|
|
| |
 |
|
Flathead County Landfill - Kalispel, Montana
Responsibilities:
BAS currently provides landfill gas regulatory compliance support, and
has designed upgrades to the landfill gas extraction and treatment
system at the site. This has included development and implementation of
a Montana Department of Environmental Quality air quality compliance and
reporting program, landfill gas system evaluation, and design of
landfill gas extraction and treatment system upgrades. |
|
| |
|
|
|
|
| |
|
|
Green
Valley Landfill - Hong Kong
Responsibilities: Provided engineering and design services for
expansion of flare facilities. Prepared equipment specifications,
construction bid package, and developed operation and maintenance
manuals. With the new flare the LFG processing capacity, including
existing installations, increased to 6,700 SCFM.
|
|
| |
Back
to Solid Waste Projects
|
|
|
|